Installation of ASTEC Manufacturing inlet assembly per ASTECH Manufacturing, Inc.
Document no. MDL-030-06009 titled Master Drawing List - MD-80 Series Inlet, Revision A00, dtd 6/20/01 or later FAA approved revision.
GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of Inlets for turbofan and turboprop applications
With the application of our technologies we can reduce inlet cost and weight whilst improving sound attenuation. GKN Aerospace also has the capability to meet new anti-icing requirements through the design and certification of both hot air and electro-thermal systems on metallic and composite inlets. Further advantage is gained through the integration of these features into the overall inlet structure.
Advantages
Aircraft Deployed On
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 11/19/2002
Responsible Office: Los Angeles Aircraft Certification Office (ANM-100L), Tel: (562) 627-5200
McDonnell Douglas Corporation
Advantages
Aircraft Deployed On